Lightning is an act of God that risks life and assets. There is no known method to prevent lightning strikes. The only prudent approach is to measure and manage the lightning risk.

The purpose of the Lightning Protection System (LPS) Adequacy Audit is to conduct a lightning risk assessment, determine the level of protection required for a structure or facility as per the latest standards, and ensure the existing LPS is healthy and adequate. Aadithya's audit helps manage and mitigate lightning risk to protect life and assets.

Engineering Team

Application Areas

12+

Audit Process

Why It Matters

Understanding the critical importance of a properly maintained and audited system to ensure ultimate safety and reliability.

Why it matters

To measure lightning risk to the structure and its contents.

Why it matters

Identify structures requiring protection and determine the required level as per latest standards.

Why it matters

Check the healthiness of the existing LPS system.

Why it matters

Determine whether protection is in place for both radiated and conducted surges.

Why it matters

Identify gaps in the present system with respect to current standards.

Why it matters

Ensure compliance with latest and relevant Indian and International Standards.

Why it matters

Provide recommendations for corrective action with BOQ and design drawings.

5+

Standards
Compliant

5+

Value
Additions

100%

Safety
Assured

Our Value Proposition

Site survey, data collection, and measurements by qualified engineers.

Lightning risk assessment and study of existing LPS and earthing systems.

Inspection of air terminations, down conductors, and internal LPS.

Cost-optimal solutions to minimise lightning risk to assets and personnel.

Expert recommendations compliant with latest Indian and International Standards.

Key Deliverables

Step 1

Lightning Risk Assessment Report

Step 2

Adequacy Review of Existing LPS

Step 3

Inspection Report for Air Termination & Down Conductors

Step 4

Internal LPS Review (SPD adequacy)

Step 5

Corrective Action Recommendations with BOQ and Drawings

Reference Standards

IS/IEC 62305NFC 17-102NFPA 780National Building Code 2016Central Electricity Authority — 2016 Draft

Industries Served

  • Commercial & Cultural Heritage Buildings
  • Public Service Structures & Utilities
  • IT/ITES Facilities
  • Hospitals & Hotels
  • Retail Outlets & Shopping Malls
  • Factories & Manufacturing Plants
  • Oil & Gas
  • Metro Rail
  • Process Plants
  • Wind & Solar Plants
  • Communication Towers
  • Power Plants & Substations

Ready to secure your infrastructure?

Book an Audit Now